What should be checked before bathroom walls close?

Short answer: confirm the selected fixtures and trim, rough-in positions, supports, access, connections, testing, documentation and responsibility for the remaining trades.

Pre-close plumbing checklist

  1. Products: match model numbers, valve bodies, trims, drains and fixture instructions.
  2. Locations: verify centre lines, heights, depths and the finished wall or floor build-up.
  3. Support and access: confirm blocking, service access and space for future connections.
  4. Connections: review visible water, drain and vent work within the accepted scope.
  5. Testing: complete the agreed testing before finishes hide the work.
  6. Evidence: take wide and close-up photos of concealed plumbing for the project record.
  7. Handoff: state what is ready for inspection or the next trade and what remains excluded.
Shower valve body and secured copper piping visible before bathroom wall closure
Valve position, support and connections can be reviewed while the wall remains open.
Open rear wall showing shower valve water piping before insulation and wall closure
Access-side documentation helps preserve a record of concealed work.
Do not close the wall because the calendar says so.

Close it when the required project checks, approvals and handoffs are actually complete.

This is a planning checklist, not a substitute for the project-specific inspection or municipal process.