Pre-close plumbing checklist
- Products: match model numbers, valve bodies, trims, drains and fixture instructions.
- Locations: verify centre lines, heights, depths and the finished wall or floor build-up.
- Support and access: confirm blocking, service access and space for future connections.
- Connections: review visible water, drain and vent work within the accepted scope.
- Testing: complete the agreed testing before finishes hide the work.
- Evidence: take wide and close-up photos of concealed plumbing for the project record.
- Handoff: state what is ready for inspection or the next trade and what remains excluded.


Do not close the wall because the calendar says so.
Close it when the required project checks, approvals and handoffs are actually complete.
This is a planning checklist, not a substitute for the project-specific inspection or municipal process.