Bathroom plumbing documented before it disappeared behind the finish.

This real sequence records open construction, shower-valve rough-in, concealed supply piping and finished bathroom context. Customer identity, address and unconfirmed city are withheld.

Project location: NOT_CONFIRMED for publicationPlumbing scope onlyMetadata removed
01

Open construction

Removed finishes exposed floor and wall conditions for project-specific review.

Bathroom floor and wall area opened during renovation
20 August 2025. Open construction before the concealed plumbing sequence was complete.
02

Shower valve rough-in

The valve body and piping were visible before final wall closure.

Shower valve body and copper supply piping secured inside an open wall
22 August 2025. Plumbing evidence from the front side of the wall.
03

Rear-side documentation

The opposite side recorded the supply routing and concealed valve connections.

Rear wall access showing shower valve supply lines during bathroom renovation
22 August 2025. Access-side view before the assembly was concealed.
04

Finished fixture context

Later photos show the connected vanity and shower context. They do not claim Raccoon completed tile, cabinetry, glass, electrical or every other visible trade.

Finished bathroom vanity, sink and faucet
28 August 2025. Vanity and faucet context.
Finished shower enclosure and bathroom fixtures
28 August 2025. Finished shower and fixture context.

Evidence boundary: the catalog groups these files as one bathroom rough-in-and-finish sequence. The page attributes only the plumbing evidence supported by the photographs.